Installing cedar siding planks requires at least three workers.
Installing cedar channel siding.
Flashing is an important line of defense in controlling moisture in wall assemblies.
Do not nail through overlaps.
In addition to the specific materials already mentioned a number of new tools were used for the siding installation shown.
Installing western red cedar siding c ongratulations on your choice of western red cedar siding western red cedar is one of the world s.
304 grade is fine for general siding applications while no.
Channel siding installs with a minimal amount of effort and material wastage.
Wider siding should be face nailed using two nails per piece.
Siding up to 6 inches wide can be blind nailed with one siding nail per bearing toe nailed through the base of each tongue.
Lap siding can be installed horizontally or vertically.
It features a high air output 6 0 scfm rating at 90 psi for fast recharge.
316 grade stainless should be used when installing near salt water.
Use an air nailer if possible to speed nailing and minimize damage to siding surface from hammer dents.
The channel pattern is traditionally installed horizontally with the edge of one board having a recessed area along its rear which receives the shaped top rear edge of the board next to or below it so as to exclude water during rainfall.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
For siding up to 6 inches wide use one nail one inch up from the lap.
In horizontal application start at the bottom and work up with the groove edges facing downwards.
The nails we are using f.
Channel 3 4 2 6d 7 8 2 1 4 7d battens for board 3 4 3 10d and batten figure 2.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
Stainless steel nails are the best choice for installing western red cedar siding especially if the siding is to be finished with transparent or semi transparent stain.
Features of recommended nails shanks heads ring spiral siding.
The first is a jobsite air compressor the porter cable job boss 150 psi oil free compressor.