Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
Leveling siding starter strip.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Family handyman use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Description documents this vinyl starter strip is used prior to installing the first row of siding and helps keep siding level and straight.
Then find your lowest point of the home.
Pull this same measurement on each corner.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
You attach the bottom of the first row of siding to the top of this starter strip.
Vinyl siding starter strips.
This is where the new siding will begin.
It s designed to work with most sidings.
To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.
If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.
You will still be able to attach it to the wall sheathing.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
A line level isn t accurate enough.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
It protects the sheathing from rain snow and pests.
A hand level won t cut it and how do you level a chalk line.
What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
Pull a measurement down from the soffit.
This way you will always end level with your soffit.