Slide the right edge of the flashing under the highest roof pitch.
Joining two roofs different eaves.
Attach the folds using metal screws.
The primary function of these two items is for sealing the edges of the roof.
One is getting the two differently pitched planes to meet at the hip or valley rafter.
As a final touch cover the flashing with shingles.
Before joining two roofs with different pitches you can temporarily remove the eaves trim and replacing it after completing joining the roofs.
This allows water to flow off the upper panels out over the trim onto the lower panels and exits the roof at the eaves.
Make it neat by folding the flashing edges around the roof s edges and along the bottom of the eave.
Position the flashing between the two roof pitches.
We re going to install it over top of the panels that have already been installed on the lower slope.
Jlc classics joining two roofs of different pitches.
The piece that allows us to join the two different slopes is the pitch transition trim.
We resolved the eaves by extending the line of the porch subfascia over to the tail of the last common rafter below the shed roof overhang.
Joining these two roofs poses two main challenges.
The overhang is 16 inches measured horizontally and the fascia runs at a continuous height around the entire house.
Prepare two pieces of lumber with a 1 1 inches width.
The other is to get the fascias to line up.
Then we added blocking and a vertical return.
After that cut each of them to fit the length of the joined area.