The colorplus coating is a factory applied oven baked finish available on a variety of james hardie siding and trim products.
James hardie stucco panel siding installation.
Install the second level or gable stucco panels leaving a 1 4 minimum gap between the bottom of the stucco panel and the z flashing.
This video will outline the basics of installing james hardie s fiber cement products.
We have dozens of installation specialists throughout the u s.
Please see your local james hardie dealer for texture and size availability.
Of panel siding install vinyl or coated aluminum z flashing at the top edge of the panel.
Browse the photos below to see james hardie products on real hardie homes.
Install the second level or gable panels leaving a 1 4 in.
Make sure that the flashing is sloped away from the wall and does not rest flat on the top edge of the panel.
As a homeowner you will work with a contractor who will facilitate the installation of your james hardie siding trim soffit wrap and flashing products including products with colorplus technology.
Hardieplank lap siding hardieshingle siding hardiepanel vertical siding hardietrim boards hardiesoffit pre cut panels artisan by james hardie hardiewrap weather barrier hardiebacker cement board.
This gap should never.
Alternatively the panels can be installed over wood sheathing covering foam insulation of 1 inch thick or less.
As america s 1 brand of siding james hardie fiber cement siding and trim bring beautiful design and superior performance to homes from coast to coast.
Hardiepanel vertical siding can be installed over braced wood or steel studs spaced a maximum of 2 ft.
Make sure the flashing is sloped away from the wall.
Hardiepanel vertical siding is available as a prefinished james hardie product with colorplus technology.
Install hardiepanel stucco finish vertical siding over horizontal and vertical braced wood or steel wall studs spaced a maximum of 24 inches on center.
Minimum gap between the bottom of the panel and the z flashing.
Irregularities in framing and sheathing can mirror through the finished application.
After installing the lower course of james hardie stucco panel siding install vinyl or coated aluminum z flashing at the top edge of the stucco panel.
Refer to table 1 for james hardie s multifamily commercial drainage requirements.