Strap hung molded gutter this is a typical detail of a gutter hung by straps.
Integral gutter detail.
However the potential for leaks is very great.
Integral curb and gutter integral curb and concrete pavement mountable curbs standard plan no s 410 2 vault index number b 4102 sheet 3 of 4 sheets.
This eliminates the need for wood blocking and in some cases may simplify the installation of the gutter lining.
Integral standing seam gutter plywood decking z retainer strip gutter flashing gutter strap field formed gutter support as specified by architect fastener neoprene end plug integral panel integral panel clip 30 roofing felt set in sealant headquarters 1005 tonne road elk grove village il 60007 800 pac clad fax.
This detail is similar to detail 10 3c except that a continuous reglet in the stone coping is used to anchor a continuous cleat.
Integral gutter eaves trough gutter built in gutter.
It is lined with roofing material and can hold more water than most of the other types of gutters.
180mm 75mm r 6mm r 225mm 100mm 50mm r 6mm r 50mm 6mm r 150mm min.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
Download free high quality cad drawings blocks and details of curbs and gutters organized by masterformat.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
800 722 7150 or 847 956.
Notes curbs and gutters shall be constructed of pcc conforming to subsection 201 i and 303 5.
The gutter is built into the roof structure itself as a trough see illustration below.
Straps are riveted or bolted to the outer edge at the gutter bead and attached to the roof with two brass screws.
Weakened plane joints in curb and gutter shall conform to standard specifications for.
The cleat is inserted into the reglet grouted in held by lead wedges and sealed or.
If the integral gutter is a nearly flat extension out over the roof edge also forming a soffit i d think about leaving the built in or integral gutter system in place removing any water and debris in the gutters drying out what remains and then building over the eaves trough as follows.
The straps should extend a minimum of 6 onto the roof.
Eaves trough gutters may project forward from the lower roof edge shown in the sketch below or they may be virtually hidden from view from ground level when they are built into the slope of the roof.