Allow a 1 4 in.
Intaling vinal siding.
The first piece of vinyl you re going to hang is on the starter strip.
To get all the benefits of vinyl siding ensure proper installation.
Avoid nailing siding too tightly as.
Begin by installing the first row of siding on both sides of the deck.
Find useful tips in our manual including historic restoration how to clean vinyl siding including stain removal and recycling leftover vinyl siding scrap.
The thickness of wood sheathing counts toward the total thickness that the fasteners must penetrate into nailable material usually 1 1 4 32mm.
Vinyl siding must be nailed so expansion and contraction are not restricted.
This is our most comprehensive.
Created by the vinyl siding institute vsi this manual includes installation instructions based in part on astm d4756 standard practice for installation of rigid pvc siding and soffit.
Install vinyl siding from the foundation up snapping successive pieces into the lip at the top of each piece and nailing the siding to the side of the house.
Gap for expansion wherever siding butts accessories.
To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.
Not just another vinyl siding installation video.
Vinyl siding can be installed over common wood sheathings such as plywood oriented strand board osb or other materials e g foam plastic insulating sheathing.
Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
When installing in freezing weather below 40.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
To provide a common reference point measure up 8 in.
It is important to check your level every four or five courses by putting a level on the siding.
From the top of this row and stretch a string line across the deck.
We cover how to move doors and windows and create a weather proof exterior.
On hot days because the siding will contract when the temperature drops.
Next measure and cut the siding to fit the measurements of your soffit and push each panel into the j channel.
It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long.
Gap at all ends.
Always refer to the installation guide on the particular vinyl siding that you re installing but most vinyl siding panels should overlap each other by at least an inch.