How to lay roofing felt on a hip roof.
Installing tar paper on hip roof.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Then i run a r.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Multiply the width by the height for the.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Lay the next strip.
Begin at the bottom edges of the roof and go up.
How to install roofing tar paper.
Nail it every couple of feet.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
After this lines should be snapped every 34 as you move up the roof.
Lay the first strip of tar paper side to side with its bottom.
Chalk lines should be snapped 33 5 8 above the eave line.
Begin your first row of tar paper with the bottom of the tar paper.
Allow about 1 foot 0 30 m of the felt to hang over the hip.
Start at the bottom of one side of the roof at the right or left edge.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Setting the roll and then nailing off.
Unroll the paper on the roof and cut it to the correct length with a utility knife.
Measure the width and height of each section separately.
This video walks through the very basic steps for installing tarpaper felt.
I swear it is the fastest way out there.
How to install roofing tar paper step 1.
Use a tin snips to cut the drip edge to size.
Never install the felt vertically across your roof.
Starting a roof with tarpaper felt.
Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof.
Use a ladder to reach the bottom level of the roof.
This is how i paper my vallies.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
Take a close look at how i paper the 30 in the center of the valley.