The offset cleat allows us to create a true hidden fastener installation.
Installing metal roofs panels.
Metal roofing is an excellent choice for re roofing projects because metal panels can be applied over existing shingles and other roofing material.
Take care the first piece is aligned precisely perpendicular square to the edge.
You can learn more about installing eave trim and offset cleats in another one of our metal roofing installation videos.
The eave flashing or edging is just the steel metal strips used to cover the entire perimeter of the roof.
At this point chalk a line from ridge to eave.
Having a proper job specific safety plan with 100 percent tie off rule is a good recommendation.
You are essentially sealing off the metal roof with this flashing and you need to make sure that is securely fastened.
Whether you are looking to install a new metal roof or repair an existing roof or siding on your.
Measure one panel width in from the roof edge.
1 remove the shingles before installing the metal roof the first way to install a metal roof over shingles is by completely removing the old shingles before installing the new metal roof.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
You can use 1 inch nails for the installation of eave flashing.
Place the leading edge of the first panel along this line.
With many color and profile options metal is a great choice for any architectural scheme.
Add the metal panels.
Install metal panels or shingles align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Next you are ready to install the metal roof.
Install the roofing screws vertically along each rib in the panel.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
Low slope metal roofs are often installed as structural standing seam panels over open framing.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
A benefit to doing it this way is that you can see if there is any rotten plywood that needs to be replaced before installing the new roof.