This poster is a portuguese translated overview of typical zip system sheathing details for roof applications and is formatted to be used as a printable jobsite poster.
Installing metal roofing over zip sheathing.
Taped zip panels qualify as roof underlayment in most cases.
More about wall and roof sheathing.
To create overhangs on this house the architects designed a very cool over roof with 2 bys.
Metal panels over zip system sheathing.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Use the reinforced solitex mento plus roof underlayment on top of your rafters.
5install metal panels or shingles.
Do need to rack the house with sheathing on walls or cross bracing.
Take care the first piece is aligned precisely perpendicular square to the edge.
The peel and stick underlayment overlaps the zip wall panels by about 3 to 4 inches.
Add the metal panels.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Secure the metal panel to the deck by drilling 1 1 2 inch galvanized metal screws through the peak of the rib in 12 inch to 16 inch intervals.
Installing zip system sheathing in a roof application.
Overlap the edge of the roof by 1 inch.
Begin on the left side of the roof working to the right.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Install temporary toe boards along the zip system sheathing roof surface.
Do not wear footwear with worn soles or heels.
Tate hudson a product application specialist with huber engineered woods replies.
Document share jobsite poster for zip system roof sheathing portuguese.
When installing new shingles or roofing over existing zip system sheathing you first need to install an additional code approved roofing underlayment due to the amount of nail holes left behind from the previous roof covering.
Add purlins on top of this for venting and drainage then add horizontal purlins to mount the metal roof to.
The exceptions are where the local building code or roof covering manufacturers require a membrane type underlayment.
The roof has continuous ventilation under the metal from eave to ridge.
Ensure the roofing surface is free from oil chemicals sawdust dirt tools electric cords air hoses clothing and anything else that might create a tripping hazard.
Install the roofing screws vertically along each rib in the panel.
Install the first metal panel on the low end of the roof square to the eave.