Step by step step 1.
Installing guttering and downpipes.
Working up high is hazardous so also hire scaffolding on wheels to provide easy access and simplify the installation process.
When installing guttering it is vitally important to use the correct access equipment.
Drill pilot holes then fit the.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
The minimum gutter fall to a downpipe is 1 500 meaning an extra 2mm of fall for each metre of gutter.
Start by measuring the length of guttering and downpipe you need for the project.
They are currently renovating a large lake house that required all new gutters.
Hold the cap in place and insert a single sheet metal screw into its hole.
Before buying talk with your supplier to ensure the gutter system you have selected meets the criteria.
Ensure a 6mm gap is left at the top of the downpipe for expansion.
As an alternative to installing the outlet fittings you can buy 12 in.
Finally insert the filling into the hole and fasten it with short screws.
Guttering should use either a round or square downpipe.
While this temporarily holds the cap in place drill another 1 8 inch 0 32 cm diameter hole and attach a pop rivet into it.
To attach round downpipes to square gutters you must use a sq rd downpipe adaptor.
Make a list of any connectors stop ends set angle pieces of gutter gutter outlets clips brackets usually spaced around 30 760mm apart and fixings you will need.
The offset bends can be push fit using a pipe clip ensure a pipe clip is fitted under the socket on the pipe immediately below the offset.
Lengths of gutter with factory installed outlet fittings.
In this video i install some plastic guttering to a brick built garage.
Connect the end cap s to the gutter using silicone sealant and screws.